IH10WB to SL375NB over IH 10 Wbfr/Sl 375 Nbfr
FairEl Paso County, Texas · IH 10 /Sl 375 Interchange · Structure no. 240720212104293
- Built
- 2015
- 10 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 3,492 ft
- 25 main spans
- Daily traffic
- 17,800
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
IH10WB to SL375NB over IH 10 Wbfr/Sl 375 Nbfr is a prestressed concrete stringer/multi-beam or girder carrying IH10WB to SL375NB over IH 10 Wbfr/Sl 375 Nbfr in El Paso County, Texas. It was built in 2015, so it is 10 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 17,800 vehicles a day, roughly 5% of them trucks, projected to reach 26,700 by 2033. The structure is 3,492 ft (1,064.4 m) long and 50 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH10WB to SL375NB over IH 10 Wbfr/Sl 375 Nbfr built?
It was built in 2015, making it 10 years old in 2025.
What condition is IH10WB to SL375NB over IH 10 Wbfr/Sl 375 Nbfr in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does IH10WB to SL375NB over IH 10 Wbfr/Sl 375 Nbfr carry?
About 17,800 vehicles per day (2013 count), of which roughly 5% are trucks.
How long is IH10WB to SL375NB over IH 10 Wbfr/Sl 375 Nbfr?
The structure is 3,492 ft (1,064.4 m) long with a longest span of 146 ft (44.5 m) and a deck 50 ft wide.
Who owns IH10WB to SL375NB over IH 10 Wbfr/Sl 375 Nbfr?
It is owned by the State Highway Agency.