US Bridges

IH10EBFR@MESAPARK over Open Land

Good

El Paso County, Texas · 2.36 Mi. SE of Sunland Pa · Structure no. 240720212102344

Built
2020
5 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,724 ft
14 main spans
Daily traffic
10,200
2015 count
Owner
State
State Highway Agency

About this bridge

IH10EBFR@MESAPARK over Open Land is a prestressed concrete stringer/multi-beam or girder carrying IH10EBFR@MESAPARK over Open Land in El Paso County, Texas. It was built in 2020, so it is 5 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,200 vehicles a day, roughly 5% of them trucks, projected to reach 18,500 by 2035. The structure is 1,724 ft (525.5 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH10EBFR@MESAPARK
CrossesOpen Land
Location2.36 Mi. SE of Sunland Pa
RouteInterstate 10
StateTexas
Coordinates31.8023, -106.52118
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans14 (+1 approach)
Design loadHL 93
Structure length1,724 ft (525.5 m)
Longest span126 ft (38.4 m)
Deck width40 ft (12.2 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,200 (2015)
Projected traffic18,500 by 2035
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH10EBFR@MESAPARK over Open Land built?

It was built in 2020, making it 5 years old in 2025.

What condition is IH10EBFR@MESAPARK over Open Land in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does IH10EBFR@MESAPARK over Open Land carry?

About 10,200 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is IH10EBFR@MESAPARK over Open Land?

The structure is 1,724 ft (525.5 m) long with a longest span of 126 ft (38.4 m) and a deck 40 ft wide.

Who owns IH10EBFR@MESAPARK over Open Land?

It is owned by the State Highway Agency.