US 85 WB FR over IH 10 / Spdc / Ramp
GoodEl Paso County, Texas · 0.6 MI SE of Sunland Park · Structure no. 240720212102333
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 945 ft
- 4 main spans
- Daily traffic
- 50
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
US 85 WB FR over IH 10 / Spdc / Ramp is a prestressed concrete stringer/multi-beam or girder carrying US 85 WB FR over IH 10 / Spdc / Ramp in El Paso County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 50 vehicles a day, roughly 1% of them trucks, projected to reach 11,100 by 2035. The structure is 945 ft (288 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 85 WB FR over IH 10 / Spdc / Ramp built?
It was built in 2019, making it 6 years old in 2025.
What condition is US 85 WB FR over IH 10 / Spdc / Ramp in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does US 85 WB FR over IH 10 / Spdc / Ramp carry?
About 50 vehicles per day (2015 count), of which roughly 1% are trucks.
How long is US 85 WB FR over IH 10 / Spdc / Ramp?
The structure is 945 ft (288 m) long with a longest span of 150 ft (45.7 m) and a deck 38 ft wide.
Who owns US 85 WB FR over IH 10 / Spdc / Ramp?
It is owned by the State Highway Agency.