US Bridges

US 62/180 EB over George Dieter DR

Good

El Paso County, Texas · 2.03 MI W of Sl 375 · Structure no. 240720037402116

Built
2022
3 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
227 ft
1 main span
Daily traffic
24,950
2020 count
Owner
State
State Highway Agency

About this bridge

US 62/180 EB over George Dieter DR is a prestressed concrete stringer/multi-beam or girder carrying US 62/180 EB over George Dieter DR in El Paso County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 24,950 vehicles a day, roughly 3% of them trucks, projected to reach 40,400 by 2040. The structure is 227 ft (69.2 m) long and 59 ft wide.

CarriesUS 62/180 EB
CrossesGeorge Dieter DR
Location2.03 MI W of Sl 375
RouteU.S. Route 62
StateTexas
Coordinates31.8022, -106.30237
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHL 93
Structure length227 ft (69.2 m)
Longest span95 ft (29 m)
Deck width59 ft (18 m)
Roadway width57 ft (17.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic24,950 (2020)
Projected traffic40,400 by 2040
Trucks3%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 62/180 EB over George Dieter DR built?

It was built in 2022, making it 3 years old in 2025.

What condition is US 62/180 EB over George Dieter DR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does US 62/180 EB over George Dieter DR carry?

About 24,950 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is US 62/180 EB over George Dieter DR?

The structure is 227 ft (69.2 m) long with a longest span of 95 ft (29 m) and a deck 59 ft wide.

Who owns US 62/180 EB over George Dieter DR?

It is owned by the State Highway Agency.