LP375EB to IH110NB over US 62 & US 54 NB On-Ramp
GoodEl Paso County, Texas · 0.3 MI S of Int IH 110 WB · Structure no. 240720016701256
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,391 ft
- 12 main spans
- Daily traffic
- 1,100
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
LP375EB to IH110NB over US 62 & US 54 NB On-Ramp is a prestressed concrete stringer/multi-beam or girder carrying LP375EB to IH110NB over US 62 & US 54 NB On-Ramp in El Paso County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,100 vehicles a day, projected to reach 1,400 by 2042. The structure is 1,391 ft (424 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was LP375EB to IH110NB over US 62 & US 54 NB On-Ramp built?
It was built in 2021, making it 4 years old in 2025.
What condition is LP375EB to IH110NB over US 62 & US 54 NB On-Ramp in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does LP375EB to IH110NB over US 62 & US 54 NB On-Ramp carry?
About 1,100 vehicles per day (2022 count).
How long is LP375EB to IH110NB over US 62 & US 54 NB On-Ramp?
The structure is 1,391 ft (424 m) long with a longest span of 130 ft (39.6 m) and a deck 28 ft wide.
Who owns LP375EB to IH110NB over US 62 & US 54 NB On-Ramp?
It is owned by the State Highway Agency.