US Bridges

Waterview Pkwy over Trib Red Oak Crk

Fair

Ellis County, Texas · 0.08 MI W of IH 35E · Structure no. 180710LT5213001

Built
2009
16 years old
Condition
Fair
inspected June 2023
Type
Culvert
Concrete
Length
34 ft
3 main spans
Daily traffic
158
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Waterview Pkwy over Trib Red Oak Crk is a concrete culvert carrying Waterview Pkwy over Trib Red Oak Crk in Ellis County, Texas. It was built in 2009, so it is 16 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 158 vehicles a day, roughly 3% of them trucks, projected to reach 158 by 2039. The structure is 34 ft (10.4 m) long and 71 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWaterview Pkwy
CrossesTrib Red Oak Crk
Location0.08 MI W of IH 35E
RouteCity Street 0
StateTexas
Coordinates32.51605, -96.82381
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length34 ft (10.4 m)
Longest span10 ft (3 m)
Deck width71 ft (21.6 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic158 (2019)
Projected traffic158 by 2039
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Waterview Pkwy over Trib Red Oak Crk built?

It was built in 2009, making it 16 years old in 2025.

What condition is Waterview Pkwy over Trib Red Oak Crk in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does Waterview Pkwy over Trib Red Oak Crk carry?

About 158 vehicles per day (2019 count), of which roughly 3% are trucks.

How long is Waterview Pkwy over Trib Red Oak Crk?

The structure is 34 ft (10.4 m) long with a longest span of 10 ft (3 m) and a deck 71 ft wide.

Who owns Waterview Pkwy over Trib Red Oak Crk?

It is owned by the City or Municipal Highway Agency.