US Bridges

Springer RD over Trib Shiloh Branch

Good

Ellis County, Texas · 0.2 MI E of Bryson LN · Structure no. 180710DD0240002

Built
2018
7 years old
Condition
Good
inspected June 2023
Type
Culvert
Concrete
Length
29 ft
4 main spans
Daily traffic
158
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Springer RD over Trib Shiloh Branch is a concrete culvert carrying Springer RD over Trib Shiloh Branch in Ellis County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 158 vehicles a day, roughly 3% of them trucks, projected to reach 158 by 2039. The structure is 29 ft (8.8 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSpringer RD
CrossesTrib Shiloh Branch
Location0.2 MI E of Bryson LN
RouteCity Street 0
StateTexas
Coordinates32.51349, -96.90505
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadUnknown
Structure length29 ft (8.8 m)
Longest span6 ft (1.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic158 (2019)
Projected traffic158 by 2039
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Springer RD over Trib Shiloh Branch built?

It was built in 2018, making it 7 years old in 2025.

What condition is Springer RD over Trib Shiloh Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Springer RD over Trib Shiloh Branch carry?

About 158 vehicles per day (2019 count), of which roughly 3% are trucks.

How long is Springer RD over Trib Shiloh Branch?

The structure is 29 ft (8.8 m) long with a longest span of 6 ft (1.8 m).

Who owns Springer RD over Trib Shiloh Branch?

It is owned by the City or Municipal Highway Agency.