Novy Road over Village Creek Relief
FairPosted for loadEllis County, Texas · 0.6 MI NE of SH 34 · Structure no. 180710AA0488002
- Built
- 1992
- 33 years old
- Condition
- Fair
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 34 ft
- 1 main span
- Daily traffic
- 112
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Novy Road over Village Creek Relief is a steel stringer/multi-beam or girder carrying Novy Road over Village Creek Relief in Ellis County, Texas. It was built in 1992, so it is 33 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 112 vehicles a day, projected to reach 120 by 2031. The structure is 34 ft (10.4 m) long and 17 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Novy Road over Village Creek Relief built?
It was built in 1992, making it 33 years old in 2025.
What condition is Novy Road over Village Creek Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does Novy Road over Village Creek Relief carry?
About 112 vehicles per day (2019 count).
How long is Novy Road over Village Creek Relief?
The structure is 34 ft (10.4 m) long with a longest span of 33 ft (10.1 m) and a deck 17 ft wide.
Who owns Novy Road over Village Creek Relief?
It is owned by the County Highway Agency.