US Bridges

FM 55 over Big Onion Creek

Good

Ellis County, Texas · 2.9 Miles NW of SH 34 · Structure no. 180710145101014

Built
2018
7 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
200 ft
1 main span
Daily traffic
1,400
2014 count
Owner
State
State Highway Agency

About this bridge

FM 55 over Big Onion Creek is a prestressed concrete stringer/multi-beam or girder carrying FM 55 over Big Onion Creek in Ellis County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,400 vehicles a day, roughly 4% of them trucks, projected to reach 2,000 by 2034. The structure is 200 ft (61 m) long and 42 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesFM 55
CrossesBig Onion Creek
Location2.9 Miles NW of SH 34
RouteState Highway 55
StateTexas
Coordinates32.23788, -96.81158
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1 (+2 approach)
Design loadHL 93
Structure length200 ft (61 m)
Longest span80 ft (24.4 m)
Deck width42 ft (12.9 m)
Roadway width39 ft (11.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,400 (2014)
Projected traffic2,000 by 2034
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 55 over Big Onion Creek built?

It was built in 2018, making it 7 years old in 2025.

What condition is FM 55 over Big Onion Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does FM 55 over Big Onion Creek carry?

About 1,400 vehicles per day (2014 count), of which roughly 4% are trucks.

How long is FM 55 over Big Onion Creek?

The structure is 200 ft (61 m) long with a longest span of 80 ft (24.4 m) and a deck 42 ft wide.

Who owns FM 55 over Big Onion Creek?

It is owned by the State Highway Agency.