FM 813 over Grove Creek Relief #1
GoodEllis County, Texas · 1.8 MI E of IH 45 · Structure no. 180710113902026
- Built
- 2007
- 18 years old
- Condition
- Good
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 60 ft
- 1 main span
- Daily traffic
- 814
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
FM 813 over Grove Creek Relief #1 is a prestressed concrete box beam or girders - multiple carrying FM 813 over Grove Creek Relief #1 in Ellis County, Texas. It was built in 2007, so it is 18 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 814 vehicles a day, roughly 7% of them trucks, projected to reach 1,410 by 2033. The structure is 60 ft (18.3 m) long and 46 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 813 over Grove Creek Relief #1 built?
It was built in 2007, making it 18 years old in 2025.
What condition is FM 813 over Grove Creek Relief #1 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does FM 813 over Grove Creek Relief #1 carry?
About 814 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is FM 813 over Grove Creek Relief #1?
The structure is 60 ft (18.3 m) long with a longest span of 60 ft (18.3 m) and a deck 46 ft wide.
Who owns FM 813 over Grove Creek Relief #1?
It is owned by the State Highway Agency.