US 67 Nbfr over UP Railroad
GoodEllis County, Texas · US 67 Nbfr at UP RR · Structure no. 180710026101226
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,070 ft
- 10 main spans
- Daily traffic
- 1
- 2000 count
- Owner
- State
- State Highway Agency
About this bridge
US 67 Nbfr over UP Railroad is a prestressed concrete stringer/multi-beam or girder carrying US 67 Nbfr over UP Railroad in Ellis County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1 vehicles a day, roughly 5% of them trucks, projected to reach 1,700 by 2020. The structure is 1,070 ft (326.1 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 67 Nbfr over UP Railroad built?
It was built in 2018, making it 7 years old in 2025.
What condition is US 67 Nbfr over UP Railroad in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does US 67 Nbfr over UP Railroad carry?
About 1 vehicles per day (2000 count), of which roughly 5% are trucks.
How long is US 67 Nbfr over UP Railroad?
The structure is 1,070 ft (326.1 m) long with a longest span of 115 ft (35.1 m) and a deck 38 ft wide.
Who owns US 67 Nbfr over UP Railroad?
It is owned by the State Highway Agency.