US Bridges

US 67 NB over Railport Pkwy

Good

Ellis County, Texas · 3.25 MI SW of US 287 · Structure no. 180710026002359

Built
2013
12 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
208 ft
4 main spans
Daily traffic
14,022
2019 count
Owner
State
State Highway Agency

About this bridge

US 67 NB over Railport Pkwy is a prestressed concrete stringer/multi-beam or girder carrying US 67 NB over Railport Pkwy in Ellis County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14,022 vehicles a day, roughly 16% of them trucks, projected to reach 12,900 by 2033. The structure is 208 ft (63.4 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 67 NB
CrossesRailport Pkwy
Location3.25 MI SW of US 287
RouteU.S. Route 67
StateTexas
Coordinates32.45253, -97.05895
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length208 ft (63.4 m)
Longest span52 ft (15.9 m)
Deck width40 ft (12.2 m)
Roadway width37 ft (11.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,022 (2019)
Projected traffic12,900 by 2033
Trucks16%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 67 NB over Railport Pkwy built?

It was built in 2013, making it 12 years old in 2025.

What condition is US 67 NB over Railport Pkwy in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does US 67 NB over Railport Pkwy carry?

About 14,022 vehicles per day (2019 count), of which roughly 16% are trucks.

How long is US 67 NB over Railport Pkwy?

The structure is 208 ft (63.4 m) long with a longest span of 52 ft (15.9 m) and a deck 40 ft wide.

Who owns US 67 NB over Railport Pkwy?

It is owned by the State Highway Agency.