US Bridges

US 287 SB over Frontage Road Connector

Good

Ellis County, Texas · 1.4 MI W of FM 664 · Structure no. 180710017205112

Built
1973
52 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
195 ft
1 main span
Daily traffic
24,797
2023 count
Owner
State
State Highway Agency

About this bridge

US 287 SB over Frontage Road Connector is a prestressed concrete stringer/multi-beam or girder carrying US 287 SB over Frontage Road Connector in Ellis County, Texas. It was built in 1973, so it is 52 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 24,797 vehicles a day, roughly 15% of them trucks, projected to reach 16,680 by 2033. The structure is 195 ft (59.4 m) long and 44 ft wide.

CarriesUS 287 SB
CrossesFrontage Road Connector
Location1.4 MI W of FM 664
RouteU.S. Route 287
StateTexas
Coordinates32.42963, -96.89821
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73 US tons
Inventory rating42 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length195 ft (59.4 m)
Longest span85 ft (25.9 m)
Deck width44 ft (13.4 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic24,797 (2023)
Projected traffic16,680 by 2033
Trucks15%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 287 SB over Frontage Road Connector built?

It was built in 1973, making it 52 years old in 2025.

What condition is US 287 SB over Frontage Road Connector in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does US 287 SB over Frontage Road Connector carry?

About 24,797 vehicles per day (2023 count), of which roughly 15% are trucks.

How long is US 287 SB over Frontage Road Connector?

The structure is 195 ft (59.4 m) long with a longest span of 85 ft (25.9 m) and a deck 44 ft wide.

Who owns US 287 SB over Frontage Road Connector?

It is owned by the State Highway Agency.