US Bridges

IH 45 Sbml over Grove Creek

Good

Ellis County, Texas · 2.4 MI N of FM 879 · Structure no. 180710009204272

Built
1994
31 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
605 ft
7 main spans
Daily traffic
26,603
2023 count
Owner
State
State Highway Agency

About this bridge

IH 45 Sbml over Grove Creek is a prestressed concrete stringer/multi-beam or girder carrying IH 45 Sbml over Grove Creek in Ellis County, Texas. It was built in 1994, so it is 31 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 26,603 vehicles a day, roughly 22% of them trucks, projected to reach 29,720 by 2033. The structure is 605 ft (184.4 m) long and 53 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH 45 Sbml
CrossesGrove Creek
Location2.4 MI N of FM 879
RouteInterstate 45
StateTexas
Coordinates32.40509, -96.65711
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans7 (+1 approach)
Design loadHS 20
Structure length605 ft (184.4 m)
Longest span85 ft (25.9 m)
Deck width53 ft (16.1 m)
Roadway width50 ft (15.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26,603 (2023)
Projected traffic29,720 by 2033
Trucks22%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 45 Sbml over Grove Creek built?

It was built in 1994, making it 31 years old in 2025.

What condition is IH 45 Sbml over Grove Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does IH 45 Sbml over Grove Creek carry?

About 26,603 vehicles per day (2023 count), of which roughly 22% are trucks.

How long is IH 45 Sbml over Grove Creek?

The structure is 605 ft (184.4 m) long with a longest span of 85 ft (25.9 m) and a deck 53 ft wide.

Who owns IH 45 Sbml over Grove Creek?

It is owned by the State Highway Agency.