IH 35 E over US 287 Bus and UP RR
GoodEllis County, Texas · 1.4 MI SW of US 287 · Structure no. 180710004804521
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 400 ft
- 2 main spans
- Daily traffic
- 54,983
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
IH 35 E over US 287 Bus and UP RR is a prestressed concrete stringer/multi-beam or girder carrying IH 35 E over US 287 Bus and UP RR in Ellis County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 54,983 vehicles a day, roughly 35% of them trucks, projected to reach 76,976 by 2038. The structure is 400 ft (121.9 m) long and 118 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 35 E over US 287 Bus and UP RR built?
It was built in 2019, making it 6 years old in 2025.
What condition is IH 35 E over US 287 Bus and UP RR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does IH 35 E over US 287 Bus and UP RR carry?
About 54,983 vehicles per day (2018 count), of which roughly 35% are trucks.
How long is IH 35 E over US 287 Bus and UP RR?
The structure is 400 ft (121.9 m) long with a longest span of 125 ft (38.1 m) and a deck 118 ft wide.
Who owns IH 35 E over US 287 Bus and UP RR?
It is owned by the State Highway Agency.