US Bridges

CR 350 over Sabana River

Fair

Eastland County, Texas · 1.70 MI SW of CR 364 · Structure no. 230680AA0350002

Built
1995
30 years old
Condition
Fair
inspected February 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
91 ft
3 main spans
Daily traffic
50
2013 count
Owner
County
County Highway Agency

About this bridge

CR 350 over Sabana River is a concrete stringer/multi-beam or girder carrying CR 350 over Sabana River in Eastland County, Texas. It was built in 1995, so it is 30 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, projected to reach 50 by 2033. The structure is 91 ft (27.7 m) long and 26 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesCR 350
CrossesSabana River
Location1.70 MI SW of CR 364
RouteCounty Highway 350
StateTexas
Coordinates32.1731, -98.74556
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length91 ft (27.7 m)
Longest span30 ft (9.1 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2013)
Projected traffic50 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$58,000
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 350 over Sabana River built?

It was built in 1995, making it 30 years old in 2025.

What condition is CR 350 over Sabana River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does CR 350 over Sabana River carry?

About 50 vehicles per day (2013 count).

How long is CR 350 over Sabana River?

The structure is 91 ft (27.7 m) long with a longest span of 30 ft (9.1 m) and a deck 26 ft wide.

Who owns CR 350 over Sabana River?

It is owned by the County Highway Agency.