US Bridges

SH 16 over Bear Creek

Good

Eastland County, Texas · 0.9 MI S of IH 20 · Structure no. 230680028803077

Built
2023
2 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
110 ft
1 main span
Daily traffic
980
2018 count
Owner
State
State Highway Agency

About this bridge

SH 16 over Bear Creek is a prestressed concrete stringer/multi-beam or girder carrying SH 16 over Bear Creek in Eastland County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 980 vehicles a day, roughly 28% of them trucks, projected to reach 980 by 2033. The structure is 110 ft (33.5 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSH 16
CrossesBear Creek
Location0.9 MI S of IH 20
RouteState Highway 16
StateTexas
Coordinates32.48653, -98.51975
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length110 ft (33.5 m)
Longest span110 ft (33.5 m)
Deck width46 ft (14 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic980 (2018)
Projected traffic980 by 2033
Trucks28%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 16 over Bear Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is SH 16 over Bear Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does SH 16 over Bear Creek carry?

About 980 vehicles per day (2018 count), of which roughly 28% are trucks.

How long is SH 16 over Bear Creek?

The structure is 110 ft (33.5 m) long with a longest span of 110 ft (33.5 m) and a deck 46 ft wide.

Who owns SH 16 over Bear Creek?

It is owned by the State Highway Agency.