US Bridges

FM 1260 over Salt Fork of Red River

Poor

Donley County, Texas · 7.60 MI N of FM 2471 · Structure no. 250650079502013

Built
1971
54 years old
Condition
Poor
inspected June 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
600 ft
15 main spans
Daily traffic
20
2024 count
Owner
State
State Highway Agency

About this bridge

FM 1260 over Salt Fork of Red River is a concrete stringer/multi-beam or girder carrying FM 1260 over Salt Fork of Red River in Donley County, Texas. It was built in 1971, so it is 54 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 20 vehicles a day, roughly 3% of them trucks, projected to reach 130 by 2033. The structure is 600 ft (182.9 m) long and 28 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesFM 1260
CrossesSalt Fork of Red River
Location7.60 MI N of FM 2471
RouteState Highway 1260
StateTexas
Coordinates34.99333, -100.75342
Functional classRural Major Collector

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating48.9 US tons
Inventory rating29 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans15
Design loadH 15
Structure length600 ft (182.9 m)
Longest span40 ft (12.2 m)
Deck width28 ft (8.6 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20 (2024)
Projected traffic130 by 2033
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 1260 over Salt Fork of Red River built?

It was built in 1971, making it 54 years old in 2025.

What condition is FM 1260 over Salt Fork of Red River in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in June 2023.

How much traffic does FM 1260 over Salt Fork of Red River carry?

About 20 vehicles per day (2024 count), of which roughly 3% are trucks.

How long is FM 1260 over Salt Fork of Red River?

The structure is 600 ft (182.9 m) long with a longest span of 40 ft (12.2 m) and a deck 28 ft wide.

Who owns FM 1260 over Salt Fork of Red River?

It is owned by the State Highway Agency.