US Bridges

Matejek RD over Draw

Fair

DeWitt County, Texas · 0.57 MI N of Kubala Store · Structure no. 130620AA0161001

Built
2019
6 years old
Condition
Fair
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
38 ft
1 main span
Daily traffic
33
2022 count
Owner
County
County Highway Agency

About this bridge

Matejek RD over Draw is a steel stringer/multi-beam or girder carrying Matejek RD over Draw in DeWitt County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 33 vehicles a day, roughly 3% of them trucks, projected to reach 41 by 2042. The structure is 38 ft (11.6 m) long and 28 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesMatejek RD
CrossesDraw
Location0.57 MI N of Kubala Store
RouteCounty Highway 0
StateTexas
Coordinates29.09013, -97.51466
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length38 ft (11.6 m)
Longest span38 ft (11.6 m)
Deck width28 ft (8.6 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic33 (2022)
Projected traffic41 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Matejek RD over Draw built?

It was built in 2019, making it 6 years old in 2025.

What condition is Matejek RD over Draw in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does Matejek RD over Draw carry?

About 33 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is Matejek RD over Draw?

The structure is 38 ft (11.6 m) long with a longest span of 38 ft (11.6 m) and a deck 28 ft wide.

Who owns Matejek RD over Draw?

It is owned by the County Highway Agency.