Smith Ranch Road over Draw
FairPosted for loadDeWitt County, Texas · 1.35 MI W of SH 72 · Structure no. 130620AA0138001
- Built
- 1950
- 75 years old
- Condition
- Fair
- inspected December 2023
- Type
- Slab
- Concrete Continuous
- Length
- 66 ft
- 3 main spans
- Daily traffic
- 82
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Smith Ranch Road over Draw is a concrete continuous slab carrying Smith Ranch Road over Draw in DeWitt County, Texas. It was built in 1950, so it is 75 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 82 vehicles a day, roughly 3% of them trucks, projected to reach 41 by 2042. The structure is 66 ft (20.1 m) long and 20 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Smith Ranch Road over Draw built?
It was built in 1950, making it 75 years old in 2025.
What condition is Smith Ranch Road over Draw in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Smith Ranch Road over Draw carry?
About 82 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is Smith Ranch Road over Draw?
The structure is 66 ft (20.1 m) long with a longest span of 22 ft (6.7 m) and a deck 20 ft wide.
Who owns Smith Ranch Road over Draw?
It is owned by the County Highway Agency.