US Bridges

SH 72 over E Fork Cabeza Creek

Good

DeWitt County, Texas · 1.55 MI W of FM 239 · Structure no. 130620027002191

Built
2023
2 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
39 ft
4 main spans
Daily traffic
2,790
2023 count
Owner
State
State Highway Agency

About this bridge

SH 72 over E Fork Cabeza Creek is a concrete culvert carrying SH 72 over E Fork Cabeza Creek in DeWitt County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,790 vehicles a day, roughly 32% of them trucks, projected to reach 4,847 by 2041. The structure is 39 ft (11.8 m) long and 96 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSH 72
CrossesE Fork Cabeza Creek
Location1.55 MI W of FM 239
RouteState Highway 72
StateTexas
Coordinates28.91821, -97.63458
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, precast panels
Main spans4
Design loadHL 93
Structure length39 ft (11.8 m)
Longest span8 ft (2.4 m)
Deck width96 ft (29.3 m)
Roadway width37 ft (11.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,790 (2023)
Projected traffic4,847 by 2041
Trucks32%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 72 over E Fork Cabeza Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is SH 72 over E Fork Cabeza Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does SH 72 over E Fork Cabeza Creek carry?

About 2,790 vehicles per day (2023 count), of which roughly 32% are trucks.

How long is SH 72 over E Fork Cabeza Creek?

The structure is 39 ft (11.8 m) long with a longest span of 8 ft (2.4 m) and a deck 96 ft wide.

Who owns SH 72 over E Fork Cabeza Creek?

It is owned by the State Highway Agency.