US Bridges

Grandscape Blvd EB over BNSF RR

Good

Denton County, Texas · 0.7 MI SE of SH 121 · Structure no. 180610ZA8963003

Built
2015
10 years old
Condition
Good
inspected August 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
215 ft
1 main span
Daily traffic
186
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Grandscape Blvd EB over BNSF RR is a prestressed concrete stringer/multi-beam or girder carrying Grandscape Blvd EB over BNSF RR in Denton County, Texas. It was built in 2015, so it is 10 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 186 vehicles a day, roughly 3% of them trucks, projected to reach 186 by 2041. The structure is 215 ft (65.5 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesGrandscape Blvd EB
CrossesBNSF RR
Location0.7 MI SE of SH 121
RouteCity Street 0
StateTexas
Coordinates33.07831, -96.85533
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+1 approach)
Design loadHL 93
Structure length215 ft (65.5 m)
Longest span135 ft (41.1 m)
Deck width52 ft (15.7 m)
Roadway width37 ft (11.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic186 (2021)
Projected traffic186 by 2041
Trucks3%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Grandscape Blvd EB over BNSF RR built?

It was built in 2015, making it 10 years old in 2025.

What condition is Grandscape Blvd EB over BNSF RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2022.

How much traffic does Grandscape Blvd EB over BNSF RR carry?

About 186 vehicles per day (2021 count), of which roughly 3% are trucks.

How long is Grandscape Blvd EB over BNSF RR?

The structure is 215 ft (65.5 m) long with a longest span of 135 ft (41.1 m) and a deck 52 ft wide.

Who owns Grandscape Blvd EB over BNSF RR?

It is owned by the City or Municipal Highway Agency.