US Bridges

Memorial DR over Office Creek

Good

Denton County, Texas · 0.60 MI NE of Main ST · Structure no. 180610T01997001

Built
2005
20 years old, rebuilt 2008
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
43 ft
4 main spans
Daily traffic
7,072
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Memorial DR over Office Creek is a concrete culvert carrying Memorial DR over Office Creek in Denton County, Texas. It was built in 2005 and reconstructed in 2008, so it is 20 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,072 vehicles a day, roughly 3% of them trucks, projected to reach 9,901 by 2039. The structure is 43 ft (13.1 m) long and 128 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMemorial DR
CrossesOffice Creek
Location0.60 MI NE of Main ST
RouteCity Street 0
StateTexas
Coordinates33.07302, -96.88098
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadUnknown
Structure length43 ft (13.1 m)
Longest span10 ft (3 m)
Deck width128 ft (38.9 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,072 (2019)
Projected traffic9,901 by 2039
Trucks3%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Memorial DR over Office Creek built?

It was built in 2005, making it 20 years old in 2025. It was reconstructed in 2008.

What condition is Memorial DR over Office Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Memorial DR over Office Creek carry?

About 7,072 vehicles per day (2019 count), of which roughly 3% are trucks.

How long is Memorial DR over Office Creek?

The structure is 43 ft (13.1 m) long with a longest span of 10 ft (3 m) and a deck 128 ft wide.

Who owns Memorial DR over Office Creek?

It is owned by the City or Municipal Highway Agency.