US Bridges

4th Army DR over Stewart Creek

Good

Denton County, Texas · 0.9 MI S of Stonebrook Pk · Structure no. 180610J00654001

Built
2017
8 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
400 ft
4 main spans
Daily traffic
1,000
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

4th Army DR over Stewart Creek is a prestressed concrete stringer/multi-beam or girder carrying 4th Army DR over Stewart Creek in Denton County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, projected to reach 2,000 by 2031. The structure is 400 ft (121.9 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries4th Army DR
CrossesStewart Creek
Location0.9 MI S of Stonebrook Pk
RouteCity Street 0
StateTexas
Coordinates33.12016, -96.86044
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans4
Design loadHL 93
Structure length400 ft (121.9 m)
Longest span100 ft (30.5 m)
Deck width46 ft (14 m)
Roadway width25 ft (7.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2011)
Projected traffic2,000 by 2031
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 4th Army DR over Stewart Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is 4th Army DR over Stewart Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does 4th Army DR over Stewart Creek carry?

About 1,000 vehicles per day (2011 count).

How long is 4th Army DR over Stewart Creek?

The structure is 400 ft (121.9 m) long with a longest span of 100 ft (30.5 m) and a deck 46 ft wide.

Who owns 4th Army DR over Stewart Creek?

It is owned by the City or Municipal Highway Agency.