US Bridges

FM 2281 SB over Furneaux Creek

Good

Denton County, Texas · 4.35 MI S of SH 121 · Structure no. 180610H02102004

Built
1985
40 years old, rebuilt 2016
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
286 ft
7 main spans
Daily traffic
17,518
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

FM 2281 SB over Furneaux Creek is a concrete stringer/multi-beam or girder carrying FM 2281 SB over Furneaux Creek in Denton County, Texas. It was built in 1985 and reconstructed in 2016, so it is 40 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,518 vehicles a day, roughly 1% of them trucks, projected to reach 26,730 by 2034. The structure is 286 ft (87.2 m) long and 51 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesFM 2281 SB
CrossesFurneaux Creek
Location4.35 MI S of SH 121
RouteCity Street 0
StateTexas
Coordinates32.9894, -96.90992
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20
Structure length286 ft (87.2 m)
Longest span41 ft (12.5 m)
Deck width51 ft (15.5 m)
Roadway width37 ft (11.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,518 (2022)
Projected traffic26,730 by 2034
Trucks1%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$28,000
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2281 SB over Furneaux Creek built?

It was built in 1985, making it 40 years old in 2025. It was reconstructed in 2016.

What condition is FM 2281 SB over Furneaux Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does FM 2281 SB over Furneaux Creek carry?

About 17,518 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is FM 2281 SB over Furneaux Creek?

The structure is 286 ft (87.2 m) long with a longest span of 41 ft (12.5 m) and a deck 51 ft wide.

Who owns FM 2281 SB over Furneaux Creek?

It is owned by the City or Municipal Highway Agency.