North Josey LN NB over Furneaux Creek Tributary
GoodDenton County, Texas · 0.30 MI S of Frankford RD · Structure no. 180610H01570005
- Built
- 1976
- 49 years old, rebuilt 1995
- Condition
- Good
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 80 ft
- 2 main spans
- Daily traffic
- 15,625
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
North Josey LN NB over Furneaux Creek Tributary is a concrete stringer/multi-beam or girder carrying North Josey LN NB over Furneaux Creek Tributary in Denton County, Texas. It was built in 1976 and reconstructed in 1995, so it is 49 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 15,625 vehicles a day, roughly 3% of them trucks, projected to reach 21,875 by 2042. The structure is 80 ft (24.4 m) long and 47 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was North Josey LN NB over Furneaux Creek Tributary built?
It was built in 1976, making it 49 years old in 2025. It was reconstructed in 1995.
What condition is North Josey LN NB over Furneaux Creek Tributary in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does North Josey LN NB over Furneaux Creek Tributary carry?
About 15,625 vehicles per day (2019 count), of which roughly 3% are trucks.
How long is North Josey LN NB over Furneaux Creek Tributary?
The structure is 80 ft (24.4 m) long with a longest span of 39 ft (11.9 m) and a deck 47 ft wide.
Who owns North Josey LN NB over Furneaux Creek Tributary?
It is owned by the City or Municipal Highway Agency.