US Bridges

Hebron Pkwy over Furneaux Creek

Fair

Denton County, Texas · 1.35 MI E of IH 35E · Structure no. 180610H01370007

Built
1985
40 years old
Condition
Fair
inspected December 2024
Type
Culvert
Concrete
Length
65 ft
6 main spans
Daily traffic
29,488
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Hebron Pkwy over Furneaux Creek is a concrete culvert carrying Hebron Pkwy over Furneaux Creek in Denton County, Texas. It was built in 1985, so it is 40 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 29,488 vehicles a day, roughly 1% of them trucks, projected to reach 44,232 by 2042. The structure is 65 ft (19.8 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHebron Pkwy
CrossesFurneaux Creek
Location1.35 MI E of IH 35E
RouteCity Street 0
StateTexas
Coordinates33.02472, -96.87015
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20
Structure length65 ft (19.8 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic29,488 (2022)
Projected traffic44,232 by 2042
Trucks1%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Hebron Pkwy over Furneaux Creek built?

It was built in 1985, making it 40 years old in 2025.

What condition is Hebron Pkwy over Furneaux Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does Hebron Pkwy over Furneaux Creek carry?

About 29,488 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Hebron Pkwy over Furneaux Creek?

The structure is 65 ft (19.8 m) long with a longest span of 10 ft (3 m).

Who owns Hebron Pkwy over Furneaux Creek?

It is owned by the City or Municipal Highway Agency.