US Bridges

Srt NB over Hebron Parkway

Good

Denton County, Texas · 2.12 MI NE of IH 35E · Structure no. 180610354701030

Built
2006
19 years old, rebuilt 2021
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
225 ft
2 main spans
Daily traffic
20,000
2013 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Srt NB over Hebron Parkway is a prestressed concrete stringer/multi-beam or girder carrying Srt NB over Hebron Parkway in Denton County, Texas. It was built in 2006 and reconstructed in 2021, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20,000 vehicles a day, roughly 6% of them trucks, projected to reach 47,400 by 2033. The structure is 225 ft (68.6 m) long and 82 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSrt NB
CrossesHebron Parkway
Location2.12 MI NE of IH 35E
StateTexas
Coordinates33.02232, -96.93413
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length225 ft (68.6 m)
Longest span125 ft (38.1 m)
Deck width82 ft (25 m)
Roadway width80 ft (24.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20,000 (2013)
Projected traffic47,400 by 2033
Trucks6%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Srt NB over Hebron Parkway built?

It was built in 2006, making it 19 years old in 2025. It was reconstructed in 2021.

What condition is Srt NB over Hebron Parkway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Srt NB over Hebron Parkway carry?

About 20,000 vehicles per day (2013 count), of which roughly 6% are trucks.

How long is Srt NB over Hebron Parkway?

The structure is 225 ft (68.6 m) long with a longest span of 125 ft (38.1 m) and a deck 82 ft wide.

Who owns Srt NB over Hebron Parkway?

It is owned by the Local Toll Authority.