Srt NB over Elm Fk Trinity Ri & UPRR
FairDenton County, Texas · 0.20 MI E of IH 35E · Structure no. 180610354701001
- Built
- 1999
- 26 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 3,736 ft
- 37 main spans
- Daily traffic
- 15,000
- 2014 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
Srt NB over Elm Fk Trinity Ri & UPRR is a prestressed concrete stringer/multi-beam or girder carrying Srt NB over Elm Fk Trinity Ri & UPRR in Denton County, Texas. It was built in 1999, so it is 26 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,000 vehicles a day, roughly 5% of them trucks, projected to reach 18,000 by 2034. The structure is 3,736 ft (1,138.7 m) long and 77 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Srt NB over Elm Fk Trinity Ri & UPRR built?
It was built in 1999, making it 26 years old in 2025.
What condition is Srt NB over Elm Fk Trinity Ri & UPRR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Srt NB over Elm Fk Trinity Ri & UPRR carry?
About 15,000 vehicles per day (2014 count), of which roughly 5% are trucks.
How long is Srt NB over Elm Fk Trinity Ri & UPRR?
The structure is 3,736 ft (1,138.7 m) long with a longest span of 110 ft (33.5 m) and a deck 77 ft wide.
Who owns Srt NB over Elm Fk Trinity Ri & UPRR?
It is owned by the Local Toll Authority.