FM 423 SB over Stewart Creek
GoodDenton County, Texas · 3.05 MI N of SH 121 · Structure no. 180610156702009
- Built
- 1987
- 38 years old, rebuilt 2017
- Condition
- Good
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 240 ft
- 3 main spans
- Daily traffic
- 22,701
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
FM 423 SB over Stewart Creek is a prestressed concrete stringer/multi-beam or girder carrying FM 423 SB over Stewart Creek in Denton County, Texas. It was built in 1987 and reconstructed in 2017, so it is 38 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 22,701 vehicles a day, roughly 7% of them trucks, projected to reach 36,270 by 2033. The structure is 240 ft (73.2 m) long and 70 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 423 SB over Stewart Creek built?
It was built in 1987, making it 38 years old in 2025. It was reconstructed in 2017.
What condition is FM 423 SB over Stewart Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does FM 423 SB over Stewart Creek carry?
About 22,701 vehicles per day (2019 count), of which roughly 7% are trucks.
How long is FM 423 SB over Stewart Creek?
The structure is 240 ft (73.2 m) long with a longest span of 80 ft (24.4 m) and a deck 70 ft wide.
Who owns FM 423 SB over Stewart Creek?
It is owned by the State Highway Agency.