US Bridges

FM 156 Northbound over Trail Creek

Good

Denton County, Texas · 5 Miles N of SH 114 · Structure no. 180610071801361

Built
2019
6 years old
Condition
Good
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
164 ft
3 main spans
Daily traffic
5,963
2017 count
Owner
State
State Highway Agency

About this bridge

FM 156 Northbound over Trail Creek is a prestressed concrete stringer/multi-beam or girder carrying FM 156 Northbound over Trail Creek in Denton County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,963 vehicles a day, roughly 3% of them trucks, projected to reach 7,395 by 2037. The structure is 164 ft (50 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFM 156 Northbound
CrossesTrail Creek
Location5 Miles N of SH 114
RouteState Highway 156
StateTexas
Coordinates33.05642, -97.30026
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHL 93
Structure length164 ft (50 m)
Longest span55 ft (16.8 m)
Deck width39 ft (11.8 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,963 (2017)
Projected traffic7,395 by 2037
Trucks3%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 156 Northbound over Trail Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is FM 156 Northbound over Trail Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does FM 156 Northbound over Trail Creek carry?

About 5,963 vehicles per day (2017 count), of which roughly 3% are trucks.

How long is FM 156 Northbound over Trail Creek?

The structure is 164 ft (50 m) long with a longest span of 55 ft (16.8 m) and a deck 39 ft wide.

Who owns FM 156 Northbound over Trail Creek?

It is owned by the State Highway Agency.