Dickerson NW Ramp over IH 35E R.O.W.
GoodDenton County, Texas · 0.2 MI S. of GWB/I35E JCT · Structure no. 180610019603506
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected November 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 549 ft
- 7 main spans
- Daily traffic
- 11,968
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Dickerson NW Ramp over IH 35E R.O.W. is a prestressed concrete stringer/multi-beam or girder carrying Dickerson NW Ramp over IH 35E R.O.W. in Denton County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,968 vehicles a day, projected to reach 16,760 by 2037. The structure is 549 ft (167.3 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Dickerson NW Ramp over IH 35E R.O.W. built?
It was built in 2018, making it 7 years old in 2025.
What condition is Dickerson NW Ramp over IH 35E R.O.W. in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.
How much traffic does Dickerson NW Ramp over IH 35E R.O.W. carry?
About 11,968 vehicles per day (2017 count).
How long is Dickerson NW Ramp over IH 35E R.O.W.?
The structure is 549 ft (167.3 m) long with a longest span of 76 ft (23.2 m) and a deck 28 ft wide.
Who owns Dickerson NW Ramp over IH 35E R.O.W.?
It is owned by the State Highway Agency.