US Bridges

Fox Ave & Ped Xing over IH 35E

Good

Denton County, Texas · 0.75 MI NW of SH 121 Bus · Structure no. 180610019602513

Built
2017
8 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
301 ft
2 main spans
Daily traffic
13,985
2013 count
Owner
State
State Highway Agency

About this bridge

Fox Ave & Ped Xing over IH 35E is a prestressed concrete stringer/multi-beam or girder carrying Fox Ave & Ped Xing over IH 35E in Denton County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,985 vehicles a day, projected to reach 13,985 by 2033. The structure is 301 ft (91.7 m) long and 66 ft wide.

CarriesFox Ave & Ped Xing
CrossesIH 35E
Location0.75 MI NW of SH 121 Bus
RouteCity Street 375
StateTexas
Coordinates33.03822, -97.00192
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length301 ft (91.7 m)
Longest span155 ft (47.2 m)
Deck width66 ft (20.1 m)
Roadway width46 ft (14 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,985 (2013)
Projected traffic13,985 by 2033
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Fox Ave & Ped Xing over IH 35E built?

It was built in 2017, making it 8 years old in 2025.

What condition is Fox Ave & Ped Xing over IH 35E in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Fox Ave & Ped Xing over IH 35E carry?

About 13,985 vehicles per day (2013 count).

How long is Fox Ave & Ped Xing over IH 35E?

The structure is 301 ft (91.7 m) long with a longest span of 155 ft (47.2 m) and a deck 66 ft wide.

Who owns Fox Ave & Ped Xing over IH 35E?

It is owned by the State Highway Agency and maintained by the Private (other than railroad).