IH 35E Sbml over Elm Fk Trinity Riv Rel 3
GoodDenton County, Texas · 0.30 MI SE of SH 121 · Structure no. 180610019602307
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 240 ft
- 3 main spans
- Daily traffic
- 84,023
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
IH 35E Sbml over Elm Fk Trinity Riv Rel 3 is a prestressed concrete stringer/multi-beam or girder carrying IH 35E Sbml over Elm Fk Trinity Riv Rel 3 in Denton County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 84,023 vehicles a day, roughly 7% of them trucks, projected to reach 107,150 by 2033. The structure is 240 ft (73.2 m) long and 121 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 35E Sbml over Elm Fk Trinity Riv Rel 3 built?
It was built in 2006, making it 19 years old in 2025.
What condition is IH 35E Sbml over Elm Fk Trinity Riv Rel 3 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does IH 35E Sbml over Elm Fk Trinity Riv Rel 3 carry?
About 84,023 vehicles per day (2023 count), of which roughly 7% are trucks.
How long is IH 35E Sbml over Elm Fk Trinity Riv Rel 3?
The structure is 240 ft (73.2 m) long with a longest span of 85 ft (25.9 m) and a deck 121 ft wide.
Who owns IH 35E Sbml over Elm Fk Trinity Riv Rel 3?
It is owned by the State Highway Agency.