IH 35E Sbfr over Elm Fk Trinity Riv Rel 2
FairDenton County, Texas · 0.30 MI NW of Dallas C/L · Structure no. 180610019602304
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 320 ft
- 5 main spans
- Daily traffic
- 14,607
- 2014 count
- Owner
- State
- State Highway Agency
About this bridge
IH 35E Sbfr over Elm Fk Trinity Riv Rel 2 is a prestressed concrete stringer/multi-beam or girder carrying IH 35E Sbfr over Elm Fk Trinity Riv Rel 2 in Denton County, Texas. It was built in 1995, so it is 30 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,607 vehicles a day, roughly 5% of them trucks, projected to reach 6,000 by 2034. The structure is 320 ft (97.5 m) long and 34 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 35E Sbfr over Elm Fk Trinity Riv Rel 2 built?
It was built in 1995, making it 30 years old in 2025.
What condition is IH 35E Sbfr over Elm Fk Trinity Riv Rel 2 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does IH 35E Sbfr over Elm Fk Trinity Riv Rel 2 carry?
About 14,607 vehicles per day (2014 count), of which roughly 5% are trucks.
How long is IH 35E Sbfr over Elm Fk Trinity Riv Rel 2?
The structure is 320 ft (97.5 m) long with a longest span of 64 ft (19.5 m) and a deck 34 ft wide.
Who owns IH 35E Sbfr over Elm Fk Trinity Riv Rel 2?
It is owned by the State Highway Agency.