Eagle Parkwy Uturn over IH 35W
GoodDenton County, Texas · 1.2 MI NE of Alliance Blv · Structure no. 180610008113327
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 308 ft
- 2 main spans
- Daily traffic
- 300
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Eagle Parkwy Uturn over IH 35W is a prestressed concrete stringer/multi-beam or girder carrying Eagle Parkwy Uturn over IH 35W in Denton County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 300 vehicles a day, roughly 10% of them trucks, projected to reach 1 by 1900. The structure is 308 ft (93.9 m) long and 26 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Eagle Parkwy Uturn over IH 35W built?
It was built in 2018, making it 7 years old in 2025.
What condition is Eagle Parkwy Uturn over IH 35W in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does Eagle Parkwy Uturn over IH 35W carry?
About 300 vehicles per day (2015 count), of which roughly 10% are trucks.
How long is Eagle Parkwy Uturn over IH 35W?
The structure is 308 ft (93.9 m) long with a longest span of 92 ft (28 m) and a deck 26 ft wide.
Who owns Eagle Parkwy Uturn over IH 35W?
It is owned by the State Highway Agency.