IH 35W SB Off Ramp over Catherine Branch
GoodDenton County, Texas · 1.70 MI S of FM 1171 · Structure no. 180610008113207
- Built
- 2001
- 24 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 246 ft
- 3 main spans
- Daily traffic
- 420
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
IH 35W SB Off Ramp over Catherine Branch is a prestressed concrete stringer/multi-beam or girder carrying IH 35W SB Off Ramp over Catherine Branch in Denton County, Texas. It was built in 2001, so it is 24 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 420 vehicles a day, roughly 3% of them trucks, projected to reach 700 by 2030. The structure is 246 ft (75 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 35W SB Off Ramp over Catherine Branch built?
It was built in 2001, making it 24 years old in 2025.
What condition is IH 35W SB Off Ramp over Catherine Branch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does IH 35W SB Off Ramp over Catherine Branch carry?
About 420 vehicles per day (2010 count), of which roughly 3% are trucks.
How long is IH 35W SB Off Ramp over Catherine Branch?
The structure is 246 ft (75 m) long with a longest span of 82 ft (25 m) and a deck 30 ft wide.
Who owns IH 35W SB Off Ramp over Catherine Branch?
It is owned by the State Highway Agency.