CR Ee over Palo Duro Creek
FairPosted for loadDeaf Smith County, Texas · 4.3 MI N of FM 1062 · Structure no. 040590AA0203001
- Built
- 1960
- 65 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 50 ft
- 4 main spans
- Daily traffic
- 196
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
CR Ee over Palo Duro Creek is a steel continuous stringer/multi-beam or girder carrying CR Ee over Palo Duro Creek in Deaf Smith County, Texas. It was built in 1960, so it is 65 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 196 vehicles a day, roughly 3% of them trucks, projected to reach 150 by 2027. The structure is 50 ft (15.2 m) long and 30 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR Ee over Palo Duro Creek built?
It was built in 1960, making it 65 years old in 2025.
What condition is CR Ee over Palo Duro Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does CR Ee over Palo Duro Creek carry?
About 196 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is CR Ee over Palo Duro Creek?
The structure is 50 ft (15.2 m) long with a longest span of 13 ft (4 m) and a deck 30 ft wide.
Who owns CR Ee over Palo Duro Creek?
It is owned by the County Highway Agency.