SH 214 over Tierra Blanca Creek
GoodDeaf Smith County, Texas · 4.65 MI S of FM 1058 · Structure no. 040590149102004
- Built
- 2010
- 15 years old
- Condition
- Good
- inspected November 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 140 ft
- 4 main spans
- Daily traffic
- 295
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
SH 214 over Tierra Blanca Creek is a prestressed concrete slab carrying SH 214 over Tierra Blanca Creek in Deaf Smith County, Texas. It was built in 2010, so it is 15 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 295 vehicles a day, roughly 47% of them trucks, projected to reach 160 by 2033. The structure is 140 ft (42.7 m) long and 32 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 214 over Tierra Blanca Creek built?
It was built in 2010, making it 15 years old in 2025.
What condition is SH 214 over Tierra Blanca Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does SH 214 over Tierra Blanca Creek carry?
About 295 vehicles per day (2020 count), of which roughly 47% are trucks.
How long is SH 214 over Tierra Blanca Creek?
The structure is 140 ft (42.7 m) long with a longest span of 35 ft (10.7 m) and a deck 32 ft wide.
Who owns SH 214 over Tierra Blanca Creek?
It is owned by the State Highway Agency.