Danieldale RD EB over Mauk Creek
GoodDallas County, Texas · 0.6 MI W of US 67 · Structure no. 180570K01205012
- Built
- 1989
- 36 years old
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 125 ft
- 3 main spans
- Daily traffic
- 7,337
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Danieldale RD EB over Mauk Creek is a concrete stringer/multi-beam or girder carrying Danieldale RD EB over Mauk Creek in Dallas County, Texas. It was built in 1989, so it is 36 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,337 vehicles a day, projected to reach 18,000 by 2031. The structure is 125 ft (38.1 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Danieldale RD EB over Mauk Creek built?
It was built in 1989, making it 36 years old in 2025.
What condition is Danieldale RD EB over Mauk Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does Danieldale RD EB over Mauk Creek carry?
About 7,337 vehicles per day (2022 count).
How long is Danieldale RD EB over Mauk Creek?
The structure is 125 ft (38.1 m) long with a longest span of 42 ft (12.8 m) and a deck 36 ft wide.
Who owns Danieldale RD EB over Mauk Creek?
It is owned by the City or Municipal Highway Agency.