Collins RD over Duck Creek Relief
GoodDallas County, Texas · 2.3 MI N of US 80 · Structure no. 180570JJ0015002
- Built
- 1995
- 30 years old
- Condition
- Good
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 280 ft
- 7 main spans
- Daily traffic
- 5,341
- 2014 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Collins RD over Duck Creek Relief is a concrete stringer/multi-beam or girder carrying Collins RD over Duck Creek Relief in Dallas County, Texas. It was built in 1995, so it is 30 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,341 vehicles a day, projected to reach 4,500 by 2031. The structure is 280 ft (85.3 m) long and 37 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Collins RD over Duck Creek Relief built?
It was built in 1995, making it 30 years old in 2025.
What condition is Collins RD over Duck Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does Collins RD over Duck Creek Relief carry?
About 5,341 vehicles per day (2014 count).
How long is Collins RD over Duck Creek Relief?
The structure is 280 ft (85.3 m) long with a longest span of 40 ft (12.2 m) and a deck 37 ft wide.
Who owns Collins RD over Duck Creek Relief?
It is owned by the City or Municipal Highway Agency.