US Bridges

Campbell Road over W Fk Cottonwood Crk

Good

Dallas County, Texas · 0.7 MI E of Coit RD · Structure no. 180570E00435002

Built
1960
65 years old, rebuilt 1980
Condition
Good
inspected February 2023
Type
Culvert
Concrete
Length
43 ft
4 main spans
Daily traffic
29,936
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Campbell Road over W Fk Cottonwood Crk is a concrete culvert carrying Campbell Road over W Fk Cottonwood Crk in Dallas County, Texas. It was built in 1960 and reconstructed in 1980, so it is 65 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 29,936 vehicles a day, projected to reach 16,364 by 2031. The structure is 43 ft (13.1 m) long and 135 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCampbell Road
CrossesW Fk Cottonwood Crk
Location0.7 MI E of Coit RD
RouteCity Street 0
StateTexas
Coordinates32.97822, -96.75648
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length43 ft (13.1 m)
Longest span10 ft (3 m)
Deck width135 ft (41.1 m)
Roadway width77 ft (23.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic29,936 (2019)
Projected traffic16,364 by 2031
Trucks0%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$9,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Campbell Road over W Fk Cottonwood Crk built?

It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1980.

What condition is Campbell Road over W Fk Cottonwood Crk in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does Campbell Road over W Fk Cottonwood Crk carry?

About 29,936 vehicles per day (2019 count).

How long is Campbell Road over W Fk Cottonwood Crk?

The structure is 43 ft (13.1 m) long with a longest span of 10 ft (3 m) and a deck 135 ft wide.

Who owns Campbell Road over W Fk Cottonwood Crk?

It is owned by the City or Municipal Highway Agency.