US Bridges

Wingren Ave EB over Mandalay Canal & Tramway

Good

Dallas County, Texas · 0.1 MI E of RTE 114 · Structure no. 180570D09810001

Built
1978
47 years old
Condition
Good
inspected March 2023
Type
Slab
Concrete
Length
81 ft
1 main span
Daily traffic
2,441
2009 count
Owner
City
City or Municipal Highway Agency

About this bridge

Wingren Ave EB over Mandalay Canal & Tramway is a concrete slab carrying Wingren Ave EB over Mandalay Canal & Tramway in Dallas County, Texas. It was built in 1978, so it is 47 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,441 vehicles a day, projected to reach 3,790 by 2029. The structure is 81 ft (24.7 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWingren Ave EB
CrossesMandalay Canal & Tramway
Location0.1 MI E of RTE 114
RouteCity Street 0
StateTexas
Coordinates32.86444, -96.93791
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1 (+1 approach)
Design loadUnknown
Structure length81 ft (24.7 m)
Longest span53 ft (16.2 m)
Deck width39 ft (12 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,441 (2009)
Projected traffic3,790 by 2029
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Wingren Ave EB over Mandalay Canal & Tramway built?

It was built in 1978, making it 47 years old in 2025.

What condition is Wingren Ave EB over Mandalay Canal & Tramway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Wingren Ave EB over Mandalay Canal & Tramway carry?

About 2,441 vehicles per day (2009 count).

How long is Wingren Ave EB over Mandalay Canal & Tramway?

The structure is 81 ft (24.7 m) long with a longest span of 53 ft (16.2 m) and a deck 39 ft wide.

Who owns Wingren Ave EB over Mandalay Canal & Tramway?

It is owned by the City or Municipal Highway Agency.