US Bridges

Macarthur Blvd NB over Drainage Canal

Good

Dallas County, Texas · 1.3 MI N of JCT IH 635 · Structure no. 180570D05410008

Built
1986
39 years old
Condition
Good
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
60 ft
1 main span
Daily traffic
12,040
2014 count
Owner
City
City or Municipal Highway Agency

About this bridge

Macarthur Blvd NB over Drainage Canal is a prestressed concrete stringer/multi-beam or girder carrying Macarthur Blvd NB over Drainage Canal in Dallas County, Texas. It was built in 1986, so it is 39 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,040 vehicles a day, roughly 3% of them trucks, projected to reach 17,060 by 2037. The structure is 60 ft (18.3 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMacarthur Blvd NB
CrossesDrainage Canal
Location1.3 MI N of JCT IH 635
RouteCity Street 0
StateTexas
Coordinates32.93501, -96.95215
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length60 ft (18.3 m)
Longest span59 ft (18 m)
Deck width42 ft (12.9 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,040 (2014)
Projected traffic17,060 by 2037
Trucks3%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$5,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Macarthur Blvd NB over Drainage Canal built?

It was built in 1986, making it 39 years old in 2025.

What condition is Macarthur Blvd NB over Drainage Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does Macarthur Blvd NB over Drainage Canal carry?

About 12,040 vehicles per day (2014 count), of which roughly 3% are trucks.

How long is Macarthur Blvd NB over Drainage Canal?

The structure is 60 ft (18.3 m) long with a longest span of 59 ft (18 m) and a deck 42 ft wide.

Who owns Macarthur Blvd NB over Drainage Canal?

It is owned by the City or Municipal Highway Agency.