US Bridges

E Cleveland RD over Draw

Good

Dallas County, Texas · 0.80 MI NE of IH 45 · Structure no. 180570CC0060002

Built
2019
6 years old
Condition
Good
inspected June 2023
Type
Culvert
Concrete
Length
23 ft
3 main spans
Daily traffic
4,500
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

E Cleveland RD over Draw is a concrete culvert carrying E Cleveland RD over Draw in Dallas County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,500 vehicles a day, roughly 8% of them trucks, projected to reach 6,300 by 2041. The structure is 23 ft (7 m) long and 57 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesE Cleveland RD
CrossesDraw
Location0.80 MI NE of IH 45
RouteCity Street 0
StateTexas
Coordinates32.65801, -96.69779
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length23 ft (7 m)
Longest span6 ft (1.8 m)
Deck width57 ft (17.5 m)
Roadway width35 ft (10.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,500 (2021)
Projected traffic6,300 by 2041
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was E Cleveland RD over Draw built?

It was built in 2019, making it 6 years old in 2025.

What condition is E Cleveland RD over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does E Cleveland RD over Draw carry?

About 4,500 vehicles per day (2021 count), of which roughly 8% are trucks.

How long is E Cleveland RD over Draw?

The structure is 23 ft (7 m) long with a longest span of 6 ft (1.8 m) and a deck 57 ft wide.

Who owns E Cleveland RD over Draw?

It is owned by the City or Municipal Highway Agency.