US Bridges

Lawson RD over North Mesquite Creek

Good

Dallas County, Texas · 0.27 MI NE of Cartwright · Structure no. 180570C01640002

Built
1997
28 years old
Condition
Good
inspected January 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
121 ft
4 main spans
Daily traffic
5,123
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lawson RD over North Mesquite Creek is a concrete stringer/multi-beam or girder carrying Lawson RD over North Mesquite Creek in Dallas County, Texas. It was built in 1997, so it is 28 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,123 vehicles a day, projected to reach 500 by 2031. The structure is 121 ft (36.9 m) long and 37 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesLawson RD
CrossesNorth Mesquite Creek
Location0.27 MI NE of Cartwright
RouteCity Street 0
StateTexas
Coordinates32.7234, -96.53955
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadUnknown
Structure length121 ft (36.9 m)
Longest span30 ft (9.1 m)
Deck width37 ft (11.2 m)
Roadway width34 ft (10.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,123 (2023)
Projected traffic500 by 2031
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lawson RD over North Mesquite Creek built?

It was built in 1997, making it 28 years old in 2025.

What condition is Lawson RD over North Mesquite Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does Lawson RD over North Mesquite Creek carry?

About 5,123 vehicles per day (2023 count).

How long is Lawson RD over North Mesquite Creek?

The structure is 121 ft (36.9 m) long with a longest span of 30 ft (9.1 m) and a deck 37 ft wide.

Who owns Lawson RD over North Mesquite Creek?

It is owned by the City or Municipal Highway Agency.