North Mesquite Dr. over South Mesquite Creek
GoodDallas County, Texas · 0.3 MI SE of Gusthomasson · Structure no. 180570C01260007
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected March 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 120 ft
- 3 main spans
- Daily traffic
- 5,600
- 2011 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
North Mesquite Dr. over South Mesquite Creek is a prestressed concrete box beam or girders - multiple carrying North Mesquite Dr. over South Mesquite Creek in Dallas County, Texas. It was built in 2020, so it is 5 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,600 vehicles a day, projected to reach 8,000 by 2031. The structure is 120 ft (36.6 m) long and 53 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was North Mesquite Dr. over South Mesquite Creek built?
It was built in 2020, making it 5 years old in 2025.
What condition is North Mesquite Dr. over South Mesquite Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does North Mesquite Dr. over South Mesquite Creek carry?
About 5,600 vehicles per day (2011 count).
How long is North Mesquite Dr. over South Mesquite Creek?
The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 53 ft wide.
Who owns North Mesquite Dr. over South Mesquite Creek?
It is owned by the City or Municipal Highway Agency.