Second Avenue NB over White Rock Creek
GoodDallas County, Texas · 1.10 MI SE of SH 352 · Structure no. 1805709S2340012
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected February 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 90 ft
- 3 main spans
- Daily traffic
- 10,400
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Second Avenue NB over White Rock Creek is a prestressed concrete box beam or girders - multiple carrying Second Avenue NB over White Rock Creek in Dallas County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,400 vehicles a day, projected to reach 14,400 by 2037. The structure is 90 ft (27.4 m) long and 37 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Second Avenue NB over White Rock Creek built?
It was built in 2018, making it 7 years old in 2025.
What condition is Second Avenue NB over White Rock Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Second Avenue NB over White Rock Creek carry?
About 10,400 vehicles per day (2017 count).
How long is Second Avenue NB over White Rock Creek?
The structure is 90 ft (27.4 m) long with a longest span of 40 ft (12.2 m) and a deck 37 ft wide.
Who owns Second Avenue NB over White Rock Creek?
It is owned by the City or Municipal Highway Agency.