US Bridges

Parkdale Drive over White Rock Creek Trib

Good

Dallas County, Texas · 0.2 MI W of Lawnview · Structure no. 1805709P1350003

Built
2020
5 years old
Condition
Good
inspected February 2023
Type
Culvert
Concrete
Length
29 ft
2 main spans
Daily traffic
75
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Parkdale Drive over White Rock Creek Trib is a concrete culvert carrying Parkdale Drive over White Rock Creek Trib in Dallas County, Texas. It was built in 2020, so it is 5 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75 vehicles a day, roughly 10% of them trucks, projected to reach 100 by 2037. The structure is 29 ft (8.7 m) long and 35 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesParkdale Drive
CrossesWhite Rock Creek Trib
Location0.2 MI W of Lawnview
RouteCity Street 0
StateTexas
Coordinates32.77583, -96.72102
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length29 ft (8.7 m)
Longest span12 ft (3.7 m)
Deck width35 ft (10.7 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2017)
Projected traffic100 by 2037
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Parkdale Drive over White Rock Creek Trib built?

It was built in 2020, making it 5 years old in 2025.

What condition is Parkdale Drive over White Rock Creek Trib in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does Parkdale Drive over White Rock Creek Trib carry?

About 75 vehicles per day (2017 count), of which roughly 10% are trucks.

How long is Parkdale Drive over White Rock Creek Trib?

The structure is 29 ft (8.7 m) long with a longest span of 12 ft (3.7 m) and a deck 35 ft wide.

Who owns Parkdale Drive over White Rock Creek Trib?

It is owned by the City or Municipal Highway Agency.