S Marsalis Ave SB over Cedar CK/CLARENDON/RR/15
FairDallas County, Texas · 0.3 MI S of IH 35E · Structure no. 1805709M1900004
- Built
- 1956
- 69 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 1,026 ft
- 3 main spans
- Daily traffic
- 6,256
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
S Marsalis Ave SB over Cedar CK/CLARENDON/RR/15 is a steel continuous stringer/multi-beam or girder carrying S Marsalis Ave SB over Cedar CK/CLARENDON/RR/15 in Dallas County, Texas. It was built in 1956, so it is 69 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,256 vehicles a day, roughly 3% of them trucks, projected to reach 17,349 by 2041. The structure is 1,026 ft (312.7 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Marsalis Ave SB over Cedar CK/CLARENDON/RR/15 built?
It was built in 1956, making it 69 years old in 2025.
What condition is S Marsalis Ave SB over Cedar CK/CLARENDON/RR/15 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does S Marsalis Ave SB over Cedar CK/CLARENDON/RR/15 carry?
About 6,256 vehicles per day (2019 count), of which roughly 3% are trucks.
How long is S Marsalis Ave SB over Cedar CK/CLARENDON/RR/15?
The structure is 1,026 ft (312.7 m) long with a longest span of 78 ft (23.8 m) and a deck 39 ft wide.
Who owns S Marsalis Ave SB over Cedar CK/CLARENDON/RR/15?
It is owned by the City or Municipal Highway Agency.